Divine Meadows Resale |
1165 Sqft 2Bhk + StudySector 108 Noida ExpresswayLogin : – 4000Asking :-5300 Jaypee Klassic Tower B5 |
The Company is coming up with a mega Group-Housing Project “Divine Meadows” at Plot No. GH-04, Sector-108,Noida, abutting Noida-Greater Noida Expressway. The Project shall consist of 500 saleable dwelling units of various sizes, designs and specifications constructed in about fifteen-storied towers spread over sprawling four acres land with all modern amenities and soothing landscapes at affordable prices, to become the first choice for all those looking for a habitat in Noida or an investment opportunity which can ensure healthy returns in this time of global economics crisis. |
|
Specifications |
|
STRUCTURE | Rcc Frame | Earthquake Resistant Structure | FLOORING | Drawing/Dining/Kitchen | Vitrified Tile | | All Bedrooms | Vitrified Tiles | | Toilet/Balconies | Ceramic Tiles | | Common Areas | Kota Stone/Marble | | Roads/Pavements | Cement Concrete/ Pavers | DOORS & WINDOWS | Frames | Hard Wood | | Door Shutters | Designer Internal Flush Door Shutters | | Window Shutters | Power Coated Aluminium /UPVC External Window Shutters | | Hardware | Powder Coated/ Stainless Steel | WALL CLADDING | Kitchen | Ceramic Tiles upto 7 ft, height | | Toilets | Ceramic Tiles upto Ceiling height | FINISHING | Internal | Oil Bound Distemper on POP Plaster/Putti in All Rooms | | External | Texture Paint | SANITARY WARE/FITTINGS | Toilets/Kitchen | Superior Quality C.P. Fittings | | Kitchen | Stainless Steel Sink | C.P. FITTINGS | Toilets/Kitchen | Good Quality C.P. Fittings | ELECTRICAL FITTINGS & FIXTURES | All Rooms | Copper Concealed Wiring in Conduits with modular switches (as per ISI codes) | GENERAL | All Rooms | Provision for T.V. and Telephone |
|
|
Location Map |
|
|
|
Accessibility |
|
Easily accesibile from delhi and Greater Noida from the 6 lane Expressway- Abutting Expressway, Noida
- 16 hole golf course in the close vicinity
- 5 minutes drive fr
om Amity School - 10 minutes drive from DND flyway
- 30 Minutes from proposed International Airport
- Metro connectivity in near future
- Major schools in close vicinity such as Lotus Valley, Mayur, etc.
- Master shopping/District business centre at a stone throw
|
|
Floor Plan |
|
| | | | | | | | | | | | Unit Plan Type A1 | | Unit Plan Type A2 | | Unit Plan Type B1 | | Unit Plan Type B2 | | Unit Plan Type C1 | | Unit Plan Type C2 | | Super Area-980 sqft. | | Super Area-1165 sqft. | | Super Area-1200 sqft. | | Super Area-1345 sqft. | | Super Area-1490 sqft. | | Super Area-1655 sqft. | |
|
|
Price List |
|
Basic Sale Price (BSP) | Rs. 5200 per sq. ft. of Super Area | ADDITIONAL CHARGES (AC) | PARKING CHARGES (PC) | Covered | Rs 2,00,000/-Per Space | Open | Rs 1,00,000/-Per sace | TERRACE CHARGES (TC) | Rs. 800/-Per Sq.ft | CLUB MEMBERSHIP CHARGES (CMC) | RS.50,000/- | INTERNAL DEVELOPMENT CHARGES (IDC) (Including External Electrification Charges(EEC) FIRE Fighting Charges(FFC) and Secuirty Installation Charges (SIC) | Rs.125/-per sq.ft of Super Area | POWER BACKUP CHARGES (PBC) | RS.15000/- for 1 KVA | PREFERENTAL LOCATION CHARGES (PLC) | FLOOR | 1st to 3rd | Rs.200/-Per sq ft. of Super Area | 4th to 7th | Rs.100/-Per sq ft. of Super Area | MAINTENANCE CHARGES (MC) | INTEREST FREE MAINTENANCE SECURITY (IFMS) | Rs.50/-Per sq. ft of Super Area | MONTHLY MAINTENANCE CHARGES (MMC | Rs.1.50/-Per sq. ft of Super Area | LEASE RENT | ONE TIME LEASE RENT (OTLR) | Rs.125/-per sq.ft of Super Area |
|
|
Payment Plans |
|
DOWN PAYMENT PLAN(12% DISCOUNT) | Stage of Payment | Due Date | Basic Sale Price Payable | Other Charges Payble | Registration Money | Upon Submission Of Registration From | A1 or A2 | B1 or B2 | C1or C2 | NIL | Rs.1,50,000/- | Rs.2,25,000/- | Rs.3,00,000/- | Registration Money | Within 30 days of offer of Alloment | 12% of Basic Sale Price (including Registration Money) | NIL | Installment | Within 60 days of offer of Alloment | 73% of Basic Sale Price | Preferential Location Charges(PLC), Additional Charges and One Time Lease Rent(OTLR) | Possession Money | On offer of Possession /Sub-Lease | 3% of Basic Sale Price | Maintenance Charges (IFMS and 12 Month’s MMC in advance |
|
|
TIME LINKED INSTALMENT PLAN | Stage of Payment | Due Date | Basic Sale Price Payable | Other Charges Payble | Registration Money | Upon Submission of Registration Form | A1 or A2 | B1 or B2 | C1or C2 | NIL | Rs.1,50,000/- | Rs.2,25,000/- | Rs.3,00,000/- | Reservation Money | Within 30 days of offer of Alloment | 12% of Basic Sale Price (including Registration Money) | NIL | 1st Installment | Within 60 days of Issue offer of Alloment | 5% of Basic Sale Price | NIL | 2nd Installment | Within 90 days of Issue offer of Alloment | 5% of Basic Sale Price | NIL | 3rd Installment | Within 120 days of Issue offer of Alloment | 5% of Basic Sale Price | NIL | 4th Installment | Within 150 days of Issue offer of Alloment | 7.5% of Basic Sale Price | NIL | 5th Installment | Within 180 days of Issue offer of Alloment | 7.5% of Basic Sale Price | NIL | 6th to16 Installment | Bi-Monthly, starting from 210th day | 55% of Basic Sale Price (5% Each) | Preferential Location Charges(PLC) Payable alongwith 6th Installment and 50% of Additional Charges Payable alongwith 8th and 10 th Installment each and One Time Lease Rent (OLTR) Payable alongwith 15 the Installment | Possession Money | On Offer of Possession /Sub-Lease | 3% of Basic Sale Price | Maintenance Charges(IFMS and 12 months’s MMC in advance) |
|
|
CONSTRUCTION LINKED INSTALLEMENT PLAN | Stage of Payment | Due Date | Basic Sale Price Payable | Other Charges Payble | Registration Money | Upon Submission of Registration Form | A1 or A2 | B1 or B2 | C1or C2 | NIL | Rs.1,50,000/- | Rs.2,25,000/- | Rs.3,00,000/- | Reservation Money | Within 30 days of Offer of Allotment | 12% of basic Sale Price (Including Refistration Money) | NIL | 1st Installment | On Bhoomi Poojan/ Excavation | 5% Basic sale Price | NIL | 2nd Installment | On Commencement Of Foundation | 5% Basic sale Price | NIL | 3rd Installment | On Commencement Of plinth beam/DPC | 5% Basic sale Price | NIL | 4th Installment | On laying of basement roof Slab | 7.5% Basic sale Price | NIL | 5th Installment | On laying of ground Floor roof Slab | 7.5% Basic sale Price | NIL | 6th Installment | On laying of 2nd Floor roof Slab | 5% Basic sale Price | NIL | 7th Installment | On laying of 4th Floor roof Slab | 5% Basic sale Price | NIL | 8th Installment | On laying of 6thFloor roof Slab | 5% Basic sale Price | preferential Location Charges (PLC) | 9th Installment | On laying of 8th Floor roof Slab | 5% Basic sale Price | NIL | 10th Installment | On laying of 10th Floor roof Slab | 5% Basic sale Price | 50% of Additional Charges (AC) | 11th Installment | On laying of 12th Floor roof Slab | 5% Basic sale Price | | 12th Installment | On laying of 14th Floor roof Slab | 5% Basic sale Price | 50% of Additional Charges (AC) | 13th Installment | On laying of 16thFloor roof Slab | 5% Basic sale Price | NIL | 14th Installment | On laying of Top Floor roof Slab | 5% Basic sale Price | NIL | 15th Installment | On completion of Internal Plaster within the Flat | 5% Basic sale Price | NIL | 16th Installment | On completion of Internal Flooring within the Flat | 5% Basic sale Price | One Time Lease Rent (OTLR) | Possession Money | On offer of Possession/Sub-Lease | 3% Basic sale Price | Maintenance Charges (IFMS and 12 month’MMC in advance |
|